PM A / B Schedule
1. PM Task List
Preventive Maintenance Field Data Sheet
Open the active project PM tasklist. Perform ACR T1 baseline scans, coil tuning, console, scanner room, computer room, and chiller inspections with real-time pass/fail validation.
- Interactive Task Directory with Jump Navigation
- Real-time QA Spec Checking (SNR, Ghosting, Uniformity, CMRF)
- Heat Exchanger Pressure & Temperature Matrix
- Field Engineer Digital Signature & Compliance Audit
- Uploads JSON & HTML directly to SharePoint
Official Form 5503020-01 Rev C
2. FONAR Service Report
Fillable Service Report (5503020aRevC.pdf)
Open and create a fillable FONAR Service Report similar to the PM task list. Log labor expenses, problem descriptions, repair activities, replaced parts, test data, and digital signature.
- Fillable web form modeled directly on 5503020aRevC.pdf
- 5-Row Labor Expense & Travel Time Breakdown
- Section A & B Part Details and Serial Number Logging
- Touch/Stylus Digital Signature permanently embedded into PDF
- Deposits signed PDF into "Service Reports" SharePoint directory